Discovering, Analyzing, Visualizing and Presenting Data

 

Data Analytics Lifecycle

2.4 Phase 3: Model Planning

In Phase 3, the data science team identifies candidate models to apply to the data for clustering, classifying, or finding relationships in the data depending on the goal of the project, as shown in Figure 2.5. It is during this phase that the team refers to the hypotheses developed in Phase 1, when they first became acquainted with the data and understanding the business problems or domain area. These hypotheses help the team frame the analytics to execute in Phase 4 and select the right methods to achieve its objectives.

 


Figure 2.5 Model planning phase

Some of the activities to consider in this phase include the following:

• Assess the structure of the datasets. The structure of the datasets is one factor that dictates the tools and analytical techniques for the next phase. Depending on whether the team plans to analyze textual data or transactional data, for example, different tools and approaches are required.

• Assess the structure of the datasets. The structure of the datasets is one factor that dictates the tools and analytical techniques for the next phase. Depending on whether the team plans to analyze textual data or transactional data, for example, different tools and approaches are required.

• Determine if the situation warrants a single model or a series of techniques as part of a larger analytic workflow. A few example models include association rules (Chapter 5, “Advanced Analytical Theory and Methods: Association Rules”) and logistic regression (Chapter 6, “Advanced Analytical Theory and Methods: Regression”). Other tools, such as Alpine Miner, enable users to set up a series of steps and analyses and can serve as a front-end user interface (UI) for manipulating Big Data sources in PostgreSQL.

In addition to the considerations just listed, it is useful to research and understand how other analysts generally approach a specific kind of problem. Given the kind of data and resources that are available, evaluate whether similar, existing approaches will work or if the team will need to create something new. Many times teams can get ideas from analogous problems that other people have solved in different industry verticals or domain areas. Table 2.2 summarizes the results of an exercise of this type, involving several domain areas and the types of models previously used in a classification type of problem after conducting research on churn models in multiple industry verticals. Performing this sort of diligence gives the team ideas of how others have solved similar problems and presents the team with a list of candidate models to try as part of the model planning phase.

Table 2.2 Research on Model Planning in Industry Verticals

 


2.4.1 Data Exploration and Variable Selection

Although some data exploration takes place in the data preparation phase, those activities focus mainly on data hygiene and on assessing the quality of the data itself. In Phase 3, the objective of the data exploration is to understand the relationships among the variables to inform selection of the variables and methods and to understand the problem domain. As with earlier phases of the Data Analytics Lifecycle, it is important to spend time and focus attention on this preparatory work to make the subsequent phases of model selection and execution easier and more efficient. A common way to conduct this step involves using tools to perform data visualizations. Approaching the data exploration in this way aids the team in previewing the data and assessing relationships between variables at a high level.

In many cases, stakeholders and subject matter experts have instincts and hunches about what the data science team should be considering and analyzing. Likely, this group had some hypothesis that led to the genesis of the project. Often, stakeholders have a good grasp of the problem and domain, although they may not be aware of the subtleties within the data or the model needed to accept or reject a hypothesis. Other times, stakeholders may be correct, but for the wrong reasons (for instance, they may be correct about a correlation that exists but infer an incorrect reason for the correlation). Meanwhile, data scientists have to approach problems with an unbiased mind-set and be ready to question all assumptions.

As the team begins to question the incoming assumptions and test initial ideas of the project sponsors and stakeholders, it needs to consider the inputs and data that will be needed, and then it must examine whether these inputs are actually correlated with the outcomes that the team plans to predict or analyze. Some methods and types of models will handle correlated variables better than others. Depending on what the team is attempting to solve, it may need to consider an alternate method, reduce the number of data inputs, or transform the inputs to allow the team to use the best method for a given business problem. Some of these techniques will be explored further in Chapter 3 and Chapter 6.

The key to this approach is to aim for capturing the most essential predictors and variables rather than considering every possible variable that people think may influence the outcome. Approaching the problem in this manner requires iterations and testing to identify the most essential variables for the intended analyses. The team should plan to test a range of variables to include in the model and then focus on the most important and influential variables.

If the team plans to run regression analyses, identify the candidate predictors and outcome variables of the model. Plan to create variables that determine outcomes but demonstrate a strong relationship to the outcome rather than to the other input variables. This includes remaining vigilant for problems such as serial correlation, multicollinearity, and other typical data modeling challenges that interfere with the validity of these models. Sometimes these issues can be avoided simply by looking at ways to reframe a given problem. In addition, sometimes determining correlation is all that is needed (“black box prediction”), and in other cases, the objective of the project is to understand the causal relationship better. In the latter case, the team wants the model to have explanatory power and needs to forecast or stress test the model under a variety of situations and with different datasets.

 

2.4.2 Model Selection

In the model selection subphase, the team’s main goal is to choose an analytical technique, or a short list of candidate techniques, based on the end goal of the project. For the context of this book, a model is discussed in general terms. In this case, a model simply refers to an abstraction from reality. One observes events happening in a real-world situation or with live data and attempts to construct models that emulate this behavior with a set of rules and conditions. In the case of machine learning and data mining, these rules and conditions are grouped into several general sets of techniques, such as classification, association rules, and clustering. When reviewing this list of types of potential models, the team can winnow down the list to several viable models to try to address a given problem. More details on matching the right models to common types of business problems are provided in Chapter 3 and Chapter 4, “Advanced Analytical Theory and Methods: Clustering.”

An additional consideration in this area for dealing with Big Data involves determining if the team will be using techniques that are best suited for structured data, unstructured data, or a hybrid approach. For instance, the team can leverage MapReduce to analyze unstructured data, as highlighted in Chapter 10. Lastly, the team should take care to identify and document the modeling assumptions it is making as it chooses and constructs preliminary models.

Typically, teams create the initial models using a statistical software package such as R, SAS, or Matlab. Although these tools are designed for data mining and machine learning algorithms, they may have limitations when applying the models to very large datasets, as is common with Big Data. As such, the team may consider redesigning these algorithms to run in the database itself during the pilot phase mentioned in Phase 6.

The team can move to the model building phase once it has a good idea about the type of model to try and the team has gained enough knowledge to refine the analytics plan. Advancing from this phase requires a general methodology for the analytical model, a solid understanding of the variables and techniques to use, and a description or diagram of the analytic workflow.

 

2.4.3 Common Tools for the Model Planning Phase

Many tools are available to assist in this phase. Here are several of the more common ones:

• R [14] has a complete set of modeling capabilities and provides a good environment for building interpretive models with high-quality code. In addition, it has the ability to interface with databases via an ODBC connection and execute statistical tests and analyses against Big Data via an open source connection. These two factors make R well suited to performing statistical tests and analytics on Big Data. As of this writing, R contains nearly 5,000 packages for data analysis and graphical representation. New packages are posted frequently, and many companies are providing value-add services for R (such as training, instruction, and best practices), as well as packaging it in ways to make it easier to use and more robust. This phenomenon is similar to what happened with Linux in the late 1980s and early 1990s, when companies appeared to package and make Linux easier for companies to consume and deploy. Use R with file extracts for offline analysis and optimal performance, and use RODBC connections for dynamic queries and faster development.

• SQL Analysis services [15] can perform in-database analytics of common data mining functions, involved aggregations, and basic predictive models.

• SAS/ACCESS [16] provides integration between SAS and the analytics sandbox via multiple data connectors such as OBDC, JDBC, and OLE DB. SAS itself is generally used on file extracts, but with SAS/ACCESS, users can connect to relational databases (such as Oracle or Teradata) and data warehouse appliances (such as Greenplum or Aster), files, and enterprise applications (such as SAP and Salesforce.com).

 

2.5 Phase 4: Model Building

In Phase 4, the data science team needs to develop datasets for training, testing, and production purposes. These datasets enable the data scientist to develop the analytical model and train it (“training data”), while holding aside some of the data (“hold-out data” or “test data”) for testing the model. (These topics are addressed in more detail in Chapter 3.) During this process, it is critical to ensure that the training and test datasets are sufficiently robust for the model and analytical techniques. A simple way to think of these datasets is to view the training dataset for conducting the initial experiments and the test sets for validating an approach once the initial experiments and models have been run.

In the model building phase, shown in Figure 2.6, an analytical model is developed and fit on the training data and evaluated (scored) against the test data. The phases of model planning and model building can overlap quite a bit, and in practice one can iterate back and forth between the two phases for a while before settling on a final model.

 


Figure 2.6 Model building phase

Although the modeling techniques and logic required to develop models can be highly complex, the actual duration of this phase can be short compared to the time spent preparing the data and defining the approaches. In general, plan to spend more time preparing and learning the data (Phases 1–2) and crafting a presentation of the findings (Phase 5). Phases 3 and 4 tend to move more quickly, although they are more complex from a conceptual standpoint.

As part of this phase, the data science team needs to execute the models defined in Phase 3.

During this phase, users run models from analytical software packages, such as R or SAS, on file extracts and small datasets for testing purposes. On a small scale, assess the validity of the model and its results. For instance, determine if the model accounts for most of the data and has robust predictive power. At this point, refine the models to optimize the results, such as by modifying variable inputs or reducing correlated variables where appropriate. In Phase 3, the team may have had some knowledge of correlated variables or problematic data attributes, which will be confirmed or denied once the models are actually executed. When immersed in the details of constructing models and transforming data, many small decisions are often made about the data and the approach for the modeling. These details can be easily forgotten once the project is completed. Therefore, it is vital to record the results and logic of the model during this phase. In addition, one must take care to record any operating assumptions that were made in the modeling process regarding the data or the context.

Creating robust models that are suitable to a specific situation requires thoughtful consideration to ensure the models being developed ultimately meet the objectives outlined in Phase 1. Questions to consider include these:

• Does the model appear valid and accurate on the test data?

• Does the model output/behavior make sense to the domain experts? That is, does it appear as if the model is giving answers that make sense in this context?

• Do the parameter values of the fitted model make sense in the context of the domain?

• Is the model sufficiently accurate to meet the goal?

• Does the model avoid intolerable mistakes? Depending on context, false positives may be more serious or less serious than false negatives, for instance. (False positives and false negatives are discussed further in Chapter 3 and Chapter 7, “Advanced Analytical Theory and Methods: Classification.”)

• Are more data or more inputs needed? Do any of the inputs need to be transformed or eliminated?

• Will the kind of model chosen support the runtime requirements?

• Is a different form of the model required to address the business problem? If so, go back to the model planning phase and revise the modeling approach.

Once the data science team can evaluate either if the model is sufficiently robust to solve the problem or if the team has failed, it can move to the next phase in the Data Analytics Lifecycle.

 

2.5.1 Common Tools for the Model Building Phase

There are many tools available to assist in this phase, focused primarily on statistical analysis or data mining software. Common tools in this space include, but are not limited to, the following:

• Commercial Tools:

◦ SAS Enterprise Miner [17] allows users to run predictive and descriptive models based on large volumes of data from across the enterprise. It interoperates with other large data stores, has many partnerships, and is built for enterprise-level computing and analytics.

◦ SPSS Modeler [18] (provided by IBM and now called IBM SPSS Modeler) offers methods to explore and analyze data through a GUI.

◦ Matlab [19] provides a high-level language for performing a variety of data analytics, algorithms, and data exploration.

◦ Alpine Miner [11] provides a GUI front end for users to develop analytic workflows and interact with Big Data tools and platforms on the back end.

◦ STATISTICA [20] and Mathematica [21] are also popular and well-regarded data mining and analytics tools.

• Free or Open Source tools:

◦ R and PL/R [14] R was described earlier in the model planning phase, and PL/R is a procedural language for PostgreSQL with R. Using this approach means that R commands can be executed in database. This technique provides higher performance and is more scalable than running R in memory.

◦ Octave [22], a free software programming language for computational modeling, has some of the functionality of Matlab. Because it is freely available, Octave is used in major universities when teaching machine learning.

◦ WEKA [23] is a free data mining software package with an analytic workbench. The functions created in WEKA can be executed within Java code.

◦ Python is a programming language that provides toolkits for machine learning and analysis, such as scikit-learn, numpy, scipy, pandas, and related data visualization using matplotlib.

◦ SQL in-database implementations, such as MADlib [24], provide an alterative to in-memory desktop analytical tools. MADlib provides an open-source machine learning library of algorithms that can be executed in-database, for PostgreSQL or Greenplum.

 

2.6 Phase 5: Communicate Results

After executing the model, the team needs to compare the outcomes of the modeling to the criteria established for success and failure. In Phase 5, shown in Figure 2.7, the team considers how best to articulate the findings and outcomes to the various team members and stakeholders, taking into account caveats, assumptions, and any limitations of the results. Because the presentation is often circulated within an organization, it is critical to articulate the results properly and position the findings in a way that is appropriate for the audience.

 



Figure 2.7 Communicate results phase

As part of Phase 5, the team needs to determine if it succeeded or failed in its objectives. Many times people do not want to admit to failing, but in this instance failure should not be considered as a true failure, but rather as a failure of the data to accept or reject a given hypothesis adequately. This concept can be counterintuitive for those who have been told their whole careers not to fail. However, the key is to remember that the team must be rigorous enough with the data to determine whether it will prove or disprove the hypotheses outlined in Phase 1 (discovery). Sometimes teams have only done a superficial analysis, which is not robust enough to accept or reject a hypothesis. Other times, teams perform very robust analysis and are searching for ways to show results, even when results may not be there. It is important to strike a balance between these two extremes when it comes to analyzing data and being pragmatic in terms of showing real-world results.

When conducting this assessment, determine if the results are statistically significant and valid. If they are, identify the aspects of the results that stand out and may provide salient findings when it comes time to communicate them. If the results are not valid, think about adjustments that can be made to refine and iterate on the model to make it valid. During this step, assess the results and identify which data points may have been surprising and which were in line with the hypotheses that were developed in Phase 1. Comparing the actual results to the ideas formulated early on produces additional ideas and insights that would have been missed if the team had not taken time to formulate initial hypotheses early in the process.

By this time, the team should have determined which model or models address the analytical challenge in the most appropriate way. In addition, the team should have ideas of some of the findings as a result of the project. The best practice in this phase is to record all the findings and then select the three most significant ones that can be shared with the stakeholders. In addition, the team needs to reflect on the implications of these findings and measure the business value. Depending on what emerged as a result of the model, the team may need to spend time quantifying the business impact of the results to help prepare for the presentation and demonstrate the value of the findings. Doug Hubbard’s work [6] offers insights on how to assess intangibles in business and quantify the value of seemingly unmeasurable things.

Now that the team has run the model, completed a thorough discovery phase, and learned a great deal about the datasets, reflect on the project and consider what obstacles were in the project and what can be improved in the future. Make recommendations for future work or improvements to existing processes, and consider what each of the team members and stakeholders needs to fulfill her responsibilities. For instance, sponsors must champion the project. Stakeholders must understand how the model affects their processes. (For example, if the team has created a model to predict customer churn, the Marketing team must understand how to use the churn model predictions in planning their interventions.) Production engineers need to operationalize the work that has been done. In addition, this is the phase to underscore the business benefits of the work and begin making the case to implement the logic into a live production environment.

As a result of this phase, the team will have documented the key findings and major insights derived from the analysis. The deliverable of this phase will be the most visible portion of the process to the outside stakeholders and sponsors, so take care to clearly articulate the results, methodology, and business value of the findings. More details will be provided about data visualization tools and references in Chapter 12, “The Endgame, or Putting It All Together.”

 

2.7 Phase 6: Operationalize

In the final phase, the team communicates the benefits of the project more broadly and sets up a pilot project to deploy the work in a controlled way before broadening the work to a full enterprise or ecosystem of users. In Phase 4, the team scored the model in the analytics sandbox. Phase 6, shown in Figure 2.8, represents the first time that most analytics teams approach deploying the new analytical methods or models in a production environment. Rather than deploying these models immediately on a wide-scale basis, the risk can be managed more effectively and the team can learn by undertaking a small scope, pilot deployment before a wide-scale rollout. This approach enables the team to learn about the performance and related constraints of the model in a production environment on a small scale and make adjustments before a full deployment. During the pilot project, the team may need to consider executing the algorithm in the database rather than with in-memory tools such as R because the run time is significantly faster and more efficient than running in-memory, especially on larger datasets.

 


Figure 2.8 Model operationalize phase

While scoping the effort involved in conducting a pilot project, consider running the model in a production environment for a discrete set of products or a single line of business, which tests the model in a live setting. This allows the team to learn from the deployment and make any needed adjustments before launching the model across the enterprise. Be aware that this phase can bring in a new set of team members—usually the engineers responsible for the production environment who have a new set of issues and concerns beyond those of the core project team. This technical group needs to ensure that running the model fits smoothly into the production environment and that the model can be integrated into related business processes.

Part of the operationalizing phase includes creating a mechanism for performing ongoing monitoring of model accuracy and, if accuracy degrades, finding ways to retrain the model. If feasible, design alerts for when the model is operating “out-of-bounds.” This includes situations when the inputs are beyond the range that the model was trained on, which may cause the outputs of the model to be inaccurate or invalid. If this begins to happen regularly, the model needs to be retrained on new data.

Often, analytical projects yield new insights about a business, a problem, or an idea that people may have taken at face value or thought was impossible to explore. Four main deliverables can be created to meet the needs of most stakeholders. This approach for developing the four deliverables is discussed in greater detail in Chapter 12.

Figure 2.9 portrays the key outputs for each of the main stakeholders of an analytics project and what they usually expect at the conclusion of a project.

• Business User typically tries to determine the benefits and implications of the findings to the business.

• Project Sponsor typically asks questions related to the business impact of the project, the risks and return on investment (ROI), and the way the project can be evangelized within the organization (and beyond).

• Project Manager needs to determine if the project was completed on time and within budget and how well the goals were met.

• Business Intelligence Analyst needs to know if the reports and dashboards he manages will be impacted and need to change.

• Data Engineer and Database Administrator (DBA) typically need to share their code from the analytics project and create a technical document on how to implement it.

• Data Scientist needs to share the code and explain the model to her peers, managers, and other stakeholders.

 



Figure 2.9 Key outputs from a successful analytics project

Although these seven roles represent many interests within a project, these interests usually overlap, and most of them can be met with four main deliverables.

• Presentation for project sponsors: This contains high-level takeaways for executive level stakeholders, with a few key messages to aid their decision-making process. Focus on clean, easy visuals for the presenter to explain and for the viewer to grasp.

• Presentation for analysts, which describes business process changes and reporting changes. Fellow data scientists will want the details and are comfortable with technical graphs (such as Receiver Operating Characteristic [ROC] curves, density plots, and histograms shown in Chapter 3 and Chapter 7).

• Code for technical people.

• Technical specifications of implementing the code.

As a general rule, the more executive the audience, the more succinct the presentation needs to be. Most executive sponsors attend many briefings in the course of a day or a week. Ensure that the presentation gets to the point quickly and frames the results in terms of value to the sponsor’s organization. For instance, if the team is working with a bank to analyze cases of credit card fraud, highlight the frequency of fraud, the number of cases in the past month or year, and the cost or revenue impact to the bank (or focus on the reverse —how much more revenue the bank could gain if it addresses the fraud problem). This demonstrates the business impact better than deep dives on the methodology. The presentation needs to include supporting information about analytical methodology and data sources, but generally only as supporting detail or to ensure the audience has confidence in the approach that was taken to analyze the data.

When presenting to other audiences with more quantitative backgrounds, focus more time on the methodology and findings. In these instances, the team can be more expansive in describing the outcomes, methodology, and analytical experiment with a peer group. This audience will be more interested in the techniques, especially if the team developed a new way of processing or analyzing data that can be reused in the future or applied to similar problems. In addition, use imagery or data visualization when possible. Although it may take more time to develop imagery, people tend to remember mental pictures to demonstrate a point more than long lists of bullets [25]. Data visualization and presentations are discussed further in Chapter 12.

 

2.8 Case Study: Global Innovation Network and Analysis (GINA)

EMC’s Global Innovation Network and Analytics (GINA) team is a group of senior technologists located in centers of excellence (COEs) around the world. This team’s charter is to engage employees across global COEs to drive innovation, research, and university partnerships. In 2012, a newly hired director wanted to improve these activities and provide a mechanism to track and analyze the related information. In addition, this team wanted to create more robust mechanisms for capturing the results of its informal conversations with other thought leaders within EMC, in academia, or in other organizations, which could later be mined for insights.

The GINA team thought its approach would provide a means to share ideas globally and increase knowledge sharing among GINA members who may be separated geographically. It planned to create a data repository containing both structured and unstructured data to accomplish three main goals.

• Store formal and informal data.

• Track research from global technologists.

• Mine the data for patterns and insights to improve the team’s operations and strategy.

The GINA case study provides an example of how a team applied the Data Analytics Lifecycle to analyze innovation data at EMC. Innovation is typically a difficult concept to measure, and this team wanted to look for ways to use advanced analytical methods to identify key innovators within the company.

 

2.8.1 Phase 1: Discovery

In the GINA project’s discovery phase, the team began identifying data sources. Although GINA was a group of technologists skilled in many different aspects of engineering, it had some data and ideas about what it wanted to explore but lacked a formal team that could perform these analytics. After consulting with various experts including Tom Davenport, a noted expert in analytics at Babson College, and Peter Gloor, an expert in collective intelligence and creator of CoIN (Collaborative Innovation Networks) at MIT, the team decided to crowdsource the work by seeking volunteers within EMC.

Here is a list of how the various roles on the working team were fulfilled.

• Business User, Project Sponsor, Project Manager: Vice President from Office of the CTO

• Business Intelligence Analyst: Representatives from IT

• Data Engineer and Database Administrator (DBA): Representatives from IT

• Data Scientist: Distinguished Engineer, who also developed the social graphs shown in the GINA case study

The project sponsor’s approach was to leverage social media and blogging [26] to accelerate the collection of innovation and research data worldwide and to motivate teams of “volunteer” data scientists at worldwide locations. Given that he lacked a formal team, he needed to be resourceful about finding people who were both capable and willing to volunteer their time to work on interesting problems. Data scientists tend to be passionate about data, and the project sponsor was able to tap into this passion of highly talented people to accomplish challenging work in a creative way.

The data for the project fell into two main categories. The first category represented five years of idea submissions from EMC’s internal innovation contests, known as the Innovation Roadmap (formerly called the Innovation Showcase). The Innovation Roadmap is a formal, organic innovation process whereby employees from around the globe submit ideas that are then vetted and judged. The best ideas are selected for further incubation. As a result, the data is a mix of structured data, such as idea counts, submission dates, inventor names, and unstructured content, such as the textual descriptions of the ideas themselves.

The second category of data encompassed minutes and notes representing innovation and research activity from around the world. This also represented a mix of structured and unstructured data. The structured data included attributes such as dates, names, and geographic locations. The unstructured documents contained the “who, what, when, and where” information that represents rich data about knowledge growth and transfer within the company. This type of information is often stored in business silos that have little to no visibility across disparate research teams.

The 10 main IHs that the GINA team developed were as follows:

• IH1: Innovation activity in different geographic regions can be mapped to corporate strategic directions.

• IH2: The length of time it takes to deliver ideas decreases when global knowledge transfer occurs as part of the idea delivery process.

• IH3: Innovators who participate in global knowledge transfer deliver ideas more quickly than those who do not.

• IH4: An idea submission can be analyzed and evaluated for the likelihood of receiving funding.

• IH5: Knowledge discovery and growth for a particular topic can be measured and compared across geographic regions.

• IH6: Knowledge transfer activity can identify research-specific boundary spanners in disparate regions.

• IH7: Strategic corporate themes can be mapped to geographic regions.

• IH8: Frequent knowledge expansion and transfer events reduce the time it takes to generate a corporate asset from an idea.

• IH9: Lineage maps can reveal when knowledge expansion and transfer did not (or has not) resulted in a corporate asset.

• IH10: Emerging research topics can be classified and mapped to specific ideators, innovators, boundary spanners, and assets.

The GINA (IHs) can be grouped into two categories:

• Descriptive analytics of what is currently happening to spark further creativity, collaboration, and asset generation

• Predictive analytics to advise executive management of where it should be investing in the future

 

2.8.2 Phase 2: Data Preparation

The team partnered with its IT department to set up a new analytics sandbox to store and experiment on the data. During the data exploration exercise, the data scientists and data engineers began to notice that certain data needed conditioning and normalization. In addition, the team realized that several missing datasets were critical to testing some of the analytic hypotheses.

As the team explored the data, it quickly realized that if it did not have data of sufficient quality or could not get good quality data, it would not be able to perform the subsequent steps in the lifecycle process. As a result, it was important to determine what level of data quality and cleanliness was sufficient for the project being undertaken. In the case of the GINA, the team discovered that many of the names of the researchers and people interacting with the universities were misspelled or had leading and trailing spaces in the datastore. Seemingly small problems such as these in the data had to be addressed in this phase to enable better analysis and data aggregation in subsequent phases.

 

2.8.3 Phase 3: Model Planning

In the GINA project, for much of the dataset, it seemed feasible to use social network analysis techniques to look at the networks of innovators within EMC. In other cases, it was difficult to come up with appropriate ways to test hypotheses due to the lack of data. In one case (IH9), the team made a decision to initiate a longitudinal study to begin tracking data points over time regarding people developing new intellectual property. This data collection would enable the team to test the following two ideas in the future:

• IH8: Frequent knowledge expansion and transfer events reduce the amount of time it takes to generate a corporate asset from an idea.

• IH9: Lineage maps can reveal when knowledge expansion and transfer did not (or has not) result(ed) in a corporate asset.

For the longitudinal study being proposed, the team needed to establish goal criteria for the study. Specifically, it needed to determine the end goal of a successful idea that had traversed the entire journey. The parameters related to the scope of the study included the following considerations:

• Identify the right milestones to achieve this goal.

• Trace how people move ideas from each milestone toward the goal.

• Once this is done, trace ideas that die, and trace others that reach the goal. Compare the journeys of ideas that make it and those that do not.

• Compare the times and the outcomes using a few different methods (depending on how the data is collected and assembled). These could be as simple as t-tests or perhaps involve different types of classification algorithms.

 

2.8.4 Phase 4: Model Building

In Phase 4, the GINA team employed several analytical methods. This included work by the data scientist using Natural Language Processing (NLP) techniques on the textual descriptions of the Innovation Roadmap ideas. In addition, he conducted social network analysis using R and RStudio, and then he developed social graphs and visualizations of the network of communications related to innovation using R’s ggplot2 package. Examples of this work are shown in Figures 2.10 and 2.11.

 



Figure 2.10 Social graph [27] visualization of idea submitters and finalists

 



Figure 2.11 Social graph visualization of top innovation influencers

Figure 2.10 shows social graphs that portray the relationships between idea submitters within GINA. Each color represents an innovator from a different country. The large dots with red circles around them represent hubs. A hub represents a person with high connectivity and a high “betweenness” score. The cluster in Figure 2.11 contains geographic variety, which is critical to prove the hypothesis about geographic boundary spanners. One person in this graph has an unusually high score when compared to the rest of the nodes in the graph. The data scientist identified this person and ran a query against his name within the analytic sandbox. These actions yielded the following information about this research scientist (from the social graph), which illustrated how influential he was within his business unit and across many other areas of the company worldwide:

• In 2011, he attended the ACM SIGMOD conference, which is a top-tier conference on large-scale data management problems and databases.

• He visited employees in France who are part of the business unit for EMC’s content management teams within Documentum (now part of the Information Intelligence Group, or IIG).

• He presented his thoughts on the SIGMOD conference at a virtual brownbag session attended by three employees in Russia, one employee in Cairo, one employee in Ireland, one employee in India, three employees in the United States, and one employee in Israel.

• In 2012, he attended the SDM 2012 conference in California.

• On the same trip he visited innovators and researchers at EMC federated companies, Pivotal and VMware.

• Later on that trip he stood before an internal council of technology leaders and introduced two of his researchers to dozens of corporate innovators and researchers.

This finding suggests that at least part of the initial hypothesis is correct; the data can identify innovators who span different geographies and business units. The team used Tableau software for data visualization and exploration and used the Pivotal Greenplum database as the main data repository and analytics engine.

 

2.8.5 Phase 5: Communicate Results

In Phase 5, the team found several ways to cull results of the analysis and identify the most impactful and relevant findings. This project was considered successful in identifying boundary spanners and hidden innovators. As a result, the CTO office launched longitudinal studies to begin data collection efforts and track innovation results over longer periods of time. The GINA project promoted knowledge sharing related to innovation and researchers spanning multiple areas within the company and outside of it. GINA also enabled EMC to cultivate additional intellectual property that led to additional research topics and provided opportunities to forge relationships with universities for joint academic research in the fields of Data Science and Big Data. In addition, the project was accomplished with a limited budget, leveraging a volunteer force of highly skilled and distinguished engineers and data scientists.

One of the key findings from the project is that there was a disproportionately high density of innovators in Cork, Ireland. Each year, EMC hosts an innovation contest, open to employees to submit innovation ideas that would drive new value for the company. When looking at the data in 2011, 15% of the finalists and 15% of the winners were from Ireland. These are unusually high numbers, given the relative size of the Cork COE compared to other larger centers in other parts of the world. After further research, it was learned that the COE in Cork, Ireland had received focused training in innovation from an external consultant, which was proving effective. The Cork COE came up with more innovation ideas, and better ones, than it had in the past, and it was making larger contributions to innovation at EMC. It would have been difficult, if not impossible, to identify this cluster of innovators through traditional methods or even anecdotal, word-of[1]mouth feedback. Applying social network analysis enabled the team to find a pocket of people within EMC who were making disproportionately strong contributions. These findings were shared internally through presentations and conferences and promoted through social media and blogs.

 

2.8.6 Phase 6: Operationalize

Running analytics against a sandbox filled with notes, minutes, and presentations from innovation activities yielded great insights into EMC’s innovation culture. Key findings from the project include these:

• The CTO office and GINA need more data in the future, including a marketing initiative to convince people to inform the global community on their innovation/research activities.

• Some of the data is sensitive, and the team needs to consider security and privacy related to the data, such as who can run the models and see the results.

• In addition to running models, a parallel initiative needs to be created to improve basic Business Intelligence activities, such as dashboards, reporting, and queries on research activities worldwide.

• A mechanism is needed to continually reevaluate the model after deployment. Assessing the benefits is one of the main goals of this stage, as is defining a process to retrain the model as needed.

In addition to the actions and findings listed, the team demonstrated how analytics can drive new insights in projects that are traditionally difficult to measure and quantify. This project informed investment decisions in university research projects by the CTO office and identified hidden, high-value innovators. In addition, the CTO office developed tools to help submitters improve ideas using topic modeling as part of new recommender systems to help idea submitters find similar ideas and refine their proposals for new intellectual property.

Table 2.3 outlines an analytics plan for the GINA case study example. Although this project shows only three findings, there were many more. For instance, perhaps the biggest overarching result from this project is that it demonstrated, in a concrete way, that analytics can drive new insights in projects that deal with topics that may seem difficult to measure, such as innovation.

Table 2.3 Analytic Plan from the EMC GINA Project

 


Innovation is an idea that every company wants to promote, but it can be difficult to measure innovation or identify ways to increase innovation. This project explored this issue from the standpoint of evaluating informal social networks to identify boundary spanners and influential people within innovation subnetworks. In essence, this project took a seemingly nebulous problem and applied advanced analytical methods to tease out answers using an objective, fact-based approach.

Another outcome from the project included the need to supplement analytics with a separate datastore for Business Intelligence reporting, accessible to search innovation/research initiatives. Aside from supporting decision making, this will provide a mechanism to be informed on discussions and research happening worldwide among team members in disparate locations. Finally, it highlighted the value that can be gleaned through data and subsequent analysis. Therefore, the need was identified to start formal marketing programs to convince people to submit (or inform) the global community on their innovation/research activities. The knowledge sharing was critical. Without it, GINA would not have been able to perform the analysis and identify the hidden innovators within the company.

 

Summary

This chapter described the Data Analytics Lifecycle, which is an approach to managing and executing analytical projects. This approach describes the process in six phases.

1. Discovery

2. Data preparation

3. Model planning

4. Model building

5. Communicate results

6. Operationalize

Through these steps, data science teams can identify problems and perform rigorous investigation of the datasets needed for in-depth analysis. As stated in the chapter, although much is written about the analytical methods, the bulk of the time spent on these kinds of projects is spent in preparation—namely, in Phases 1 and 2 (discovery and data preparation). In addition, this chapter discussed the seven roles needed for a data science team. It is critical that organizations recognize that Data Science is a team effort, and a balance of skills is needed to be successful in tackling Big Data projects and other complex projects involving data analytics.

 

Exercises

1. In which phase would the team expect to invest most of the project time? Why? Where would the team expect to spend the least time?

2.  What are the benefits of doing a pilot program before a full-scale rollout of a new analytical methodology? Discuss this in the context of the mini case study.

3. What kinds of tools would be used in the following phases, and for which kinds of use scenarios?

1. Phase 2: Data preparation

2. Phase 4: Model building

 

Bibliography

1. [1] T. H. Davenport and D. J. Patil, “Data Scientist: The Sexiest Job of the 21st Century,” Harvard Business Review, October 2012.

2. [2] J. Manyika, M. Chiu, B. Brown, J. Bughin, R. Dobbs, C. Roxburgh, and A. H. Byers, “Big Data: The Next Frontier for Innovation, Competition, and Productivity,” McKinsey Global Institute, 2011.

3. [3] “Scientific Method” [Online]. Available: http://en.wikipedia.org/wiki/Scientific_method.

4. [4] “CRISP-DM” [Online]. Available: http://en.wikipedia.org/wiki/Cross_Industry_Standard_Process_for_Data_Mining

5. [5] T. H. Davenport, J. G. Harris, and R. Morison, Analytics at Work: Smarter Decisions, Better Results, 2010, Harvard Business Review Press.

6. [6] D. W. Hubbard, How to Measure Anything: Finding the Value of Intangibles in Business, 2010, Hoboken, NJ: John Wiley & Sons.

7. [7] J. Cohen, B. Dolan, M. Dunlap, J. M. Hellerstein and C. Welton, MAD Skills: New Analysis Practices for Big Data, Watertown, MA 2009.

8. [8] “List of APIs” [Online]. Available: http://www.programmableweb.com/apis.

9. [9] B. Shneiderman [Online]. Available: http://www.ifp.illinois.edu/nabhcs/abstracts/shneiderman.html.

10. [10] “Hadoop” [Online]. Available: http://hadoop.apache.org.

11. [11] “Alpine Miner” [Online]. Available: http://alpinenow.com.

12. [12] “OpenRefine” [Online]. Available: http://openrefine.org.

13. [13] “Data Wrangler” [Online]. Available: http://vis.stanford.edu/wrangler/.

14. [14] “CRAN” [Online]. Available: http://cran.us.r-project.org.

15. [15] “SQL” [Online]. Available: http://en.wikipedia.org/wiki/SQL.

16. [16] a“SAS/ACCESS” [Online]. Available: http://www.sas.com/en_us/software/data-management/access.htm.

17. [17] “SAS Enterprise Miner” [Online]. Available: http://www.sas.com/en_us/software/analytics/enterprise-miner.html.

18. [18] “SPSS Modeler” [Online]. Available: http://www[1]03.ibm.com/software/products/en/category/business-analytics.

19. [19] “Matlab” [Online]. Available: http://www.mathworks.com/products/matlab/.

20. [20] “Statistica” [Online]. Available: https://www.statsoft.com.

21. [21] “Mathematica” [Online]. Available: http://www.wolfram.com/mathematica/.

22. [22] “Octave” [Online]. Available: https://www.gnu.org/software/octave/.

23. [23] “WEKA” [Online]. Available: http://www.cs.waikato.ac.nz/ml/weka/.

24. [24] “MADlib” [Online]. Available: http://madlib.net.

25. [25] K. L. Higbee, Your Memory—How It Works and How to Improve It, New York: Marlowe & Company, 1996.

26. [26] S. Todd, “Data Science and Big Data Curriculum” [Online]. Available: http://stevetodd.typepad.com/my_weblog/data-science-and-big-data[1]curriculum/.

27. [27] T. H Davenport and D. J. Patil, “Data Scientist: The Sexiest Job of the 21st Century,” Harvard Business Review, October 2012.

 

No comments:

Post a Comment

Tell your requirements and How this blog helped you.

Labels

ACTUATORS (10) AIR CONTROL/MEASUREMENT (38) ALARMS (20) ALIGNMENT SYSTEMS (2) Ammeters (12) ANALYSERS/ANALYSIS SYSTEMS (33) ANGLE MEASUREMENT/EQUIPMENT (5) APPARATUS (6) Articles (3) AUDIO MEASUREMENT/EQUIPMENT (1) BALANCES (4) BALANCING MACHINES/SERVICES (1) BOILER CONTROLS/ACCESSORIES (5) BRIDGES (7) CABLES/CABLE MEASUREMENT (14) CALIBRATORS/CALIBRATION EQUIPMENT (19) CALIPERS (3) CARBON ANALYSERS/MONITORS (5) CHECKING EQUIPMENT/ACCESSORIES (8) CHLORINE ANALYSERS/MONITORS/EQUIPMENT (1) CIRCUIT TESTERS CIRCUITS (2) CLOCKS (1) CNC EQUIPMENT (1) COIL TESTERS EQUIPMENT (4) COMMUNICATION EQUIPMENT/TESTERS (1) COMPARATORS (1) COMPASSES (1) COMPONENTS/COMPONENT TESTERS (5) COMPRESSORS/COMPRESSOR ACCESSORIES (2) Computers (1) CONDUCTIVITY MEASUREMENT/CONTROL (3) CONTROLLERS/CONTROL SYTEMS (35) CONVERTERS (2) COUNTERS (4) CURRENT MEASURMENT/CONTROL (2) Data Acquisition Addon Cards (4) DATA ACQUISITION SOFTWARE (5) DATA ACQUISITION SYSTEMS (22) DATA ANALYSIS/DATA HANDLING EQUIPMENT (1) DC CURRENT SYSTEMS (2) DETECTORS/DETECTION SYSTEMS (3) DEVICES (1) DEW MEASURMENT/MONITORING (1) DISPLACEMENT (2) DRIVES (2) ELECTRICAL/ELECTRONIC MEASUREMENT (3) ENCODERS (1) ENERGY ANALYSIS/MEASUREMENT (1) EQUIPMENT (6) FLAME MONITORING/CONTROL (5) FLIGHT DATA ACQUISITION and ANALYSIS (1) FREQUENCY MEASUREMENT (1) GAS ANALYSIS/MEASURMENT (1) GAUGES/GAUGING EQUIPMENT (15) GLASS EQUIPMENT/TESTING (2) Global Instruments (1) Latest News (35) METERS (1) SOFTWARE DATA ACQUISITION (2) Supervisory Control - Data Acquisition (1)